LBT OSU/RC Queue Observing: UTC 2008 November 25 Observers: Peter Garnavich, Haojing Yan, Jill Gerke TO: Aaron Ceranski AA: Olga Kuhn Summary: High cirrus at start of night. Mulitple system errors, noted below. In total, lost over 3hrs to this. high cirrus clouds till we were clouded out completely at about UT 08:00. Also had some trouble with rotation in the first image of several OBs. Observed: N6946, UVaLBV/PHL293B, NDy155, N628, NDv1647Ori, N672 Detailed Notes: UT 00:12 - started 25bias OB UT 00:28 -opening dome UT 00:46 - significant high cirrus clouds. began Bessel_V skyflats, 'left main mirror failed to focus' error. disconnected LBCcontrol and reconnected, no effect. recollimated mirror, no effect. LBC showes 'hard flushing' then makes no more progress. cycling power. 'CCD controller error' recieved after trying to restart LBC. cycling power for LBC again. 'CCD controller error' recieved again after restart attempt. cycle power third time. LBC appeared to come back on line, but makes no progress when try to run OB. 'left main mirror failed to focus' error. rebooting CMU and LBCcontrol. LBCcontrol up, but not allowing us to switch pages, just hanging.with 'transfering data' or 'waiting for LBCcontrol' messages. after waiting ~10min power control page comes up allowing us to turn LBC back on. UT 01:35 - doing V skyflat as test image, did not complete OB, stopped it and got 'left main mirror failed to focus' again. trying new target. UT 01:41 - moving to N6946, attempting focus OB. did not work, puts filter wheel in right place, moves rotator, but does not expose. when we stopped OB got 'left main mirror failed to focus' error. disconnected LBCcontrol from LBT and now it will expose and run focus OB properly. reconnected LBCcontrol to LBT and not exposing again. got 'left main mirror failed to focus' error when stopped OB. restarting instrument interface. not working, got same error. TO started rebooting various systems. after rebooting oss LBC was able to expose UT 02:05 - moved 10'N of N6946 to focus UT 02:15 - began N6946 OB, first image looks like it was rotated during exposure, rest ok. seeing ~.8" UT 02:52 - moving to UVaLBV/PHL293B-g, focused UT 03:00 - started PHL293B-g OB, seeing ~1." UT 03:15 - focusing for PHL293B-r UT 03:18 - started PHL293B-r OB, seeing ~1." UT 03:34 - moving to NDy155, focused UT 03:39 - began OB for NDy155 UT 04:02 - moving to N628, focused UT 04:08 - started OB for N628, rotation jump in first image, seeing ~1.3 UT 04:46 - moved to N925, focused UT 04:53 - began OB for N925, mirror error, cycling power for LBC, didn't work, can't restart. rebooted CMU. waiting for LBCcontrol to allow access to power page to restart. restart seemed to work, N925 too close to zenith for scope. UT 05:35 - moving to NDv1647Ori, focused UT 05:50 - starting NDv1647Ori OB UT 06:09 - moved to N672, focused UT 06:14 - began OB for N672, rotation jump in first image, Seeing ~1.3", UT 06:34 - 'CCD controller, OB execution error', restarting LBC, unable to restart LBC, rebooting CMU. UT 07:03 - unable to restart LBC, cycling power again. worked. Clouds thickening rapidly. UT 07:14 - refocused N672 and started OB (again), rotation jump in first image,seeing variable (clouds) ~1.3 UT 07:50 - 'rpc communication error',lost last image of OB, cycling power, didn't work, restarting CMU. UT 08:34 - LBC working, but completely clouded over. Closing dome. UT 08:43 - began 3dark OB UT 09:30 - began second set of 3dark, camera error during 2nd dark. (OB execution error). cycling power. UT 10:15 - camera working, restarting 3dark UT 10:55 - camera error at end of second dark exposure.