MODS Progress Review
2005 March 7&8
The LBT Project Office and NOAO TSIP program held a joint progress
review of MODS in Columbus on Monday and Tuesday, March 7 & 8. In
attendance from LBTPO were Mark Wagner (LBT Instrument Scientist), Joar
Brynnel (LBT System Engineer), and Olga Kuhn (LBT Support Scientist), and
from NOAO TSIP Tod Boroson and Mark Trueblood.
The purpose is to review progress to date on designing and building
MODS. This page provides copies of all documents related to the MODS
Progress Review. The review presentations were originally in Microsoft
PowerPoint, available as PDF below.
- Progress Review Presentations
- Review Agenda (19k PDF)
- Introduction & Overview, Darren DePoy (179k PDF)
- Optics, Paul Byard (260k PDF)
- Mechanical Status I, Tom O'Brien (1.4M PDF)
- Mechanical Status II, Mark Derwent (1.9M PDF)
- Mechanical Status Table (59k PDF)
- CCD Detectors, Bruce Atwood (357k PDF)
- Software, Rick Pogge & Ray Gonzalez (44k PDF)
- Instrument Control Electronics,
Dan Pappalardo (114k PDF)
- Schedule, Darren DePoy (44k PDF)
Return to: [
MODS Project Page |
OSU LBT Page |
OSU Astronomy Home Page
]
Updated: 2005 March 11 [rwp]